Mars Hill, ME
Twenty-eight wind towers at an elevation of 1,800 feet required road construction for the crane to move from tower to tower.
To design a road that worked with contours and allowed the crane the appropriate grades and radii. The foundations have huge wind loads and had marginal geotechnical conditions.
The team met the challenge by creating both the material needed and the grades required. The foundations were accomplished with the highest capacity solid rock anchors available.
With the final permits in place in Spring, the work had to be completed before severe winter conditions. An 18-month schedule was compressed to 9 months.
The project's success gave Maine people more jobs on future projects, as well as more green power.
In order to have the correct person contact you for a free on-site evaluation and quote on your rock blasting project, we need some basic information to start. Please use the button below to submit your project details and we will get back to you as soon as possible.