Royal Bank of Scotland

Stamford, CT

Project Details

  • Category: construction
  • Location: Stamford, CT
  • Schedule: On time

Scope of Work

The location was situated between I95 and all the hi-rises in Stamford. We were charged with blasting for the foundations with stable side slopes because urban work didn't allow ramps into the site.

Challenges

To have sound rock at all the footing pads. This required many different elevations and geometries for the foundation layouts.

Outcome

The outcome was a successful project.

Schedule

The schedule was met.

Summary

Differing foundation requirements demand detailed blasting methods to avoid over-breakage or high rock.